Immediate control
Making the area safe.
The first requirement may be to isolate the defect, control vehicle or pedestrian movement, or carry out suitable temporary work. The action depends on the condition found and how the site is being used.
Urgent surface defect · Yorkshire
If a pothole or failed area is affecting safe access, call Atkinson Surfacing. We will ask for the site details needed to understand the defect and discuss the next practical step.
01 / When you call
The clearest description is usually the most useful. Only inspect or photograph the area if it is safe to do so.
02 / Decide the right intervention
Immediate control
The first requirement may be to isolate the defect, control vehicle or pedestrian movement, or carry out suitable temporary work. The action depends on the condition found and how the site is being used.
Follow-on work
A lasting repair may require failed material to be removed, the area prepared and asphalt placed and compacted. Where failure is widespread, planned resurfacing may be the more appropriate route.


